top of page
Search
  • Barney

2018 is going to be an exciting year for us all at Classic Heroes


Not just because the arrival of new members of staff to help our existing team, but also the start of building work, which two phases of the building work will be carried out through the first half of the year.

Due to incredible demand for car storage we will be extending out 500 sq/m storage facility by another 200 sq/m. If you have previously enquired with us for storage you may wish to book 2018 /19 storage as we should have the new space finished late summer.

Our workshop activities continue to grow. Our restoration side is now booking a year in advance. The demand for servicing and care programmes on modern classics has risen dramatically over the last 12 months. We are adding 126 sq/m or workshop space to our existing workshop. We have new recruits lined up to join our workshop and two new ramps will be added to this area alongside a massive increase in floor space for restoration and fabrication work. We look forward to showing you around.


147 views

Recent Posts

See All
bottom of page